TME Projects
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
All Projects
- TME Conducts Training for Caltrans Engineers
- Solar Array Anchoring System, Hobbs NM
- Camille Creek Bank Stabilization
- Trinity County Landslide Repair
- Polymer Stabilized Road Surface, Rosa Residence
- Peterson Ranch Advanced Storm Water Treatment System
- Georgetown Divide Slide Repair
- Sacramento Residence Rainwater Harvesting System
- Calpine Slope Stabilization
- Caltrans Emergency Slide Repair, Hwy 70
- Sun Meadows Pond Construction and Liner
- Caltrans Turf Reinforcement Mat Installation, Hwy 26
- Polymer Stabilized Road Surface, Bear River Estates
- Lined Evaporation Pond, Foster Farm Fertilizer Plant
- Highway 126 Drainage Improvements (Caltrans)
- Folsom Bridge
- 12 Bridges, Village 9
Sun Meadows Pond Construction and Liner
Thunder Mountain installed a storm water retention pond with 40 mil HDPE liner. The pond was designed to capture storm water before leaving the site so sediment could settle out. The upper portions of the 40 mil liner were covered with reinforced shotcrete to provide protection from mechanical and UV damage. Liner was bolted with stainless steel bolts to polyurethane batton strips at inlet and outfall structures.