Calpine Slope Stabilization Posted on June 22, 2012 by Jesse Tweet Thunder Mountain installed drilled soil nails with reinforced wire and shotcrete surface to stabilize an oversteepened bank, protecting a permanent road section and providing access to an existing geothermal energy well.