Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Thunder Mountain installed drilled soil nails with reinforced wire and shotcrete surface to stabilize an oversteepened bank, protecting a permanent road section and providing access to an existing geothermal energy well.