Installing Earth Anchors

Caltrans Turf Reinforcement Mat Installation, Hwy 26

Work was completed to stabilize a roadside slope located 5 miles south of Westpoint, CA on State Highway 26. The slope sheds directly into the Mokelumne River via a drain inlet approximately 25 yards…

View of the road after polymer application

Polymer Stabilized Road Surface, Bear River Estates

Bear River Estates is a new rural subdivision near Auburn, CA. The developer chose natural looking aggregate roads, but Nevada County DOT required the main road to be paved in order to comply with fire…

foster farms liner

Lined Evaporation Pond, Foster Farm Fertilizer Plant

Environmental laws require that industrial applications protect water quality including runoff and what can infiltrate into the water table…

Backhoe Excavating Trench for Culvert

Highway 126 Drainage Improvements (Caltrans)

Thunder Mountain removed and replaced two 18” culverts, added down drains and installed under drain system to prevent further road deterioration from undermining…

Folsom Bridge

Folsom Bridge

As an integral component of The Central Valley project, the Folsom Dam was built in 1955 by the U.S. Corps of Army Engineers roughly twenty-three miles northeast of the City of Sacramento.  It is currently …

Twelve Bridges 001

12 Bridges, Village 9

Twelve Bridges, Village 9, owned by Placer Holding, Inc. infrastructure was constructed the winter of 2006 in the rolling hills of Lincoln, CA. The soils are very fine and tricky when constructing during wet season. …